Company
History
Company
Product
1980
-
Operated as the after-sales service division of Dai-ichi Dentsu Ltd.,
while advancing the development of transistor inverters.
1990
-
1991
Established as an independent company from Dai-ichi Dentsu Ltd., with a capital of 20 million yen.
-
1992
Start producing transistor invertor.
Materialize high efficiency and space-saving. -
1993
Started the manufacturing and sales of crystal growth equipment and industrial furnaces utilizing high-frequency induction heating.
-
1997
Gain 11,000,000yen and make the capital 41,000,000yen.
-
1998
Established mass production system of CZ grower with the expansion of LT single crystal demand.
2000
-
2000
The capital becomes 97,000,000yen.
-
2002
Started selling devices for compound semiconductors such as SiC single crystal growth system.
Started development of sapphire single crystal growth system by CZ Method. -
2004
Started selling the SiC single crystal growing equipment for development by solution growth method.
Started selling the rapid thermal annealing apparatus (RTA furnace) for SiC wafers. -
2005
Started manufacturing polycrystalline Si production system.
-
2006
Established Ibaraki plant with the production upgrade.
-
2007
Established second Ibaraki plant.
-
2007
Started manufacturing on assignment of polycrystalline Si ingots.
2010
-
2010
Started selling the ultra large sapphire single crystal pulling system.
-
2013
Completed R&D of HPI high frequency power supply adopting SiC module and started manufacturing.
-
2014
Started manufacturing the hybrid energy saving type SPS system.
-
2015
Started manufacturing hybrid coutinuous type SPS system.
Started manufacturing SiC high frequency induction inverter HPI series and SiC Energization inverter MEI series. -
2017
Established a new contracted test room (open lab).
Started selling the compact hot stamping system. -
2018
Started manufacturing large hot press.
-
2019
Started manufacturing glove box multi-heating furnace.
2020
-
2020
Started manufacturing hot press (block heater type).
-
2022
Announced 「Toward a Low-carbon Society」.
-
2023
Started of clean power generation to reduce greenhouse gases.
-
2024
Completed new office building at Ibaraki plant.
Registered as an "Ibaraki Eco Business Site"
